The Best Time of Year to Start a Building Project Using Structural Steel (and Why Winter Planning Pays Off)

The Best Time of Year to Start a Building Project Using Structural Steel (and Why Winter Planning Pays Off)

When people think about starting a construction project, they tend to picture spring or summer. But when it comes to structural steelwork, the smartest time to begin isn’t when the weather warms up — it’s during the winter months, particularly December to February.

If you want your build to run smoothly, avoid delays, and hit the ground running as soon as the weather improves, winter is the ideal season to get ahead.

Why Winter Is Ideal for Planning Steelwork Projects

1. Faster Access to Quotes, Drawings and Design Teams

Winter is traditionally a quieter period for on-site building work. That means:

  • Faster turnaround on quotes
  • Easier scheduling for surveys
  • Shorter wait times for structural drawings
  • Quicker communication with engineers

Instead of joining the spring rush, you move to the front of the queue.

2. Better Availability for Fabrication Slots

Steel fabrication workshops typically book up quickly from late spring onwards. By planning in winter:

  • You secure an early fabrication slot
  • Your steelwork is ready ahead of schedule
  • You avoid costly delays when construction season peaks

Starting early gives you priority and flexibility.

3. More Time for Accurate Engineering & Measurements

Rushing structural steelwork is never a good idea — precision is essential. Winter planning allows:

  • Thorough structural calculations
  • Proper design revisions
  • Accurate measurements
  • Time to match steelwork with other trades (roofers, builders, glaziers, etc.)

By the time construction starts, every detail is already fine-tuned.

4. Smoother Coordinated Start in Spring

Builders, fabricators and contractors get extremely busy from March onward. Winter planning means:

  • Everyone’s timelines can be aligned
  • Steelwork arrives on site when needed
  • Work proceeds without bottlenecks
  • You avoid competing for labour availability

Your spring or summer build becomes far more efficient.

5. Allows for Permits, Surveys and Approvals

If your project requires:

  • Structural surveys
  • Planning permission
  • Building control approval

… winter is the perfect opportunity to get these sorted. This prevents last-minute panic and allows construction to start the moment green light is given.

6. Minimises Seasonal Delays

Winter weather may not always be ideal for building, but it is perfect for:

  • Indoor fabrication
  • Pre-build preparation
  • Design finalisation
  • Ordering materials

That means you lose virtually no time.

Winter Planning = Spring Progress

By planning ahead, you effectively shift all the thinking, designing and coordinating into months when outdoor building is slower — meaning that once the weather improves, the steel can go up quickly, safely and efficiently.

Thinking About a Structural Steel Project?

Hewaswater Engineering can help you start the process now so your spring build runs like clockwork. From design and site visits to fabrication and installation, early planning always pays off.

Leave a comment

Address

Hewaswater, Sticker,
St Austell, Cornwall PL26 7JF

Contact Us

info@hewaswater.co.uk
+44 (0)1726 885200

New Enquiries

info@hewaswater.co.uk
+44 (0)1726 885200

Social Media

View Hewas Scaffolding
Hewas Water Engineering © 2018. All rights reserved.